Tender documents for gutter production and installation of rainproof
YANGZI
Release Time:
2017-09-02
Nantong Yangzi Carbon Co., Ltd.'s gutter production, installation and rainproof project, in line with the principles of fairness, justice, openness and voluntariness, conducts fair bidding to the outside world and selects the best construction unit. The relevant matters are hereby announced as follows: 1. Project overview : 1. Gutter production and installation: A: 2500T accumulator north, 1000T green body warehouse south gutter. B: Machining the aisle gutters of Line B. C: The gutter of the B-line connector warehouse in the finished product workshop. D: The gutter where the finished joint is sampled. 2. Gutter method: A. Material: 3.0MM thick galvanized sheet. B. PVC falling into the water
Nantong Yangzi Carbon Co., Ltd. Eaves gutter production, installation and rainproof project, in accordance with the principles of fairness, justice, openness and voluntariness, conduct fair bidding and select the construction unit on the basis of merit, and hereby announce the following related matters:
I. Project Overview:
1. Eaves gutter production and installation part:
A: 2500T accumulator north, 1000T green warehouse south eaves ditch.
B: Machined B-line aisle eaves gutter.
C: Finished product workshop B line joint storage eaves gutter.
D: Gutter at the sampling site of the finished joint.
2. Eaves gutter practice:
A. MATERIAL: 3.0MM THICK GALVANIZED SHEET.
B. PVC downspout.
C. Dredge the corresponding sewers.
D. Gutter bracket.
E. Anticorrosion, paint.
F. Length and section size on-site actual quantity.
3. Machining A and B line dust removal and ash release place to make color steel canopy. (including tripod, paint)
4. Repair leakage on the roof above the switchgear on the landlord's side of the machined D-line oil pump.
5. Finishing and dredging of the sewer system in the courtyard of the machining workshop (including indoor cable trench)
6. Other sporadic gutters repair work in the company.
2. Qualification requirements for bidding units
The construction units participating in the bidding must have independent legal personality and civil engineering and above (including level 3) construction qualifications.
3. Project quotation
This project adopts a one-time quotation, and this price is settled after the completion of the project. The quotation must contain the bill of quantities, the project budget, and the final quotation.
4. Project Period
Construction period: 15 days
5. Project quality
The quality of this project shall be qualified against the construction acceptance and other relevant acceptance standards. The warranty period is three years.
6. Payment for the project
After the completion and acceptance of the project, it will be settled according to the relevant regulations of the company.
7. Bidding matters
The bidders began to collect the tender documents at the Engineering Equipment Division on September 2017, 9, and the bidders submitted the bids at 5 a.m. on September 2017, 9.
The bidding unit shall pay the document and information fee of 100 yuan and (5000,<> yuan of the bid deposit) at the company's accounting office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, and the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Collect and submit the tender documents with the receipt of the Financial Planning Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the relevant departments of the contract of the bidding unit, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
9. Contact Information
Contact: Wang Xingshan Phone: 85559392 13921615786
Bidding unit: Nantong Yangtze Carbon Co., Ltd
August 0, <>