Bidding documents for labor contracting

YANGZI


Release Time:

2017-11-22

1. Bidding Instructions 1. Project name: In-plant labor contracting 2. Work location: Nantong Yangzi Carbon Co., Ltd. 3. Bidding content: Bidders will contract work tasks in the form of labor services, mainly in the company: (1), The pressing and baking workshop is engaged in the delivery of raw materials in the factory, the delivery of graphite powder, the secondary crushing of green bodies, the analysis of joint green bodies, the release of iron red powder, and the sanitation of pressing and crushing; (2), the machining workshop is engaged in the filling of graphite powder in the factory ;According to the production process requirements of the contracting party, ensure that the work tasks are completed in a timely manner with quality and quantity guaranteed. Bidders shall provide the personnel, labor tools and necessary

1. Bidding instructions

1. Project name: labor service contracting in the factory

2. Work place: Nantong Yangzi Carbon Co., Ltd

3. Bidding content: the bidder is engaged in general contracting tasks in the form of labor services, mainly in the company: (1) the press roasting workshop is engaged in the transportation and delivery of raw materials in the factory, the release of graphite powder, the secondary crushing of green blanks, the analysis of joint green blanks, the iron red powder, and the hygiene of pressing medium crushing; (2) The machine processing workshop is engaged in the filling of graphite powder in the factory; According to the requirements of the production process of the contractor, ensure the timely completion of the work task with quality and quantity. Bidders shall provide the personnel, labor tools and necessary equipment necessary to complete the work tasks.

4. Introduction of bidding projects:

(1) Raw material pulling and release: In 2017, about 30000,<> tons of material were pulled in the factory.

(2) Graphite powder release: about 2017,2000 tons were put in <>.

(3) Filling graphite powder: about 2017,6000 tons were filled in <>.

(4) Secondary crushing of green blanks: about 2017,15000 tons were crushed in <>.

(5) Joint green analysis: analysis is arranged according to actual production needs.

(6) Iron red powder delivery: About 2017 tons were put in 120.

(7) Medium crushing hygiene: dust and accumulation on the second to fifth floors and stairs

Ash sweeping.

(6) Specific work content of project contracting: please refer to the attached materials for details.

5. Bidder's quotation:

(1) Refer to the workload tonnage of the previous year, combined with its own contracting capacity and ability

Competitive advantage to quote, i.e. the unit price of the contract (indicating the invoice type and tax rate)

(2) The contractor's quotation includes labor and social insurance and other benefits stipulated by the state and localities

Profit fees.

6. The deadlines for issuing tender documents and receiving tender documents are: November 2017, 11 and December 21, 2017 at 12:1 after the announcement.

7. Registration and bid deposit: The bid deposit of <>,<> yuan must be paid to the finance department when bidding, and the deposit of the unsuccessful bidder must be returned on the day after the end of the bid opening; The winning bidder's bond will be used as a breach of contract for signing the contract.

8. Registration method: the tenderer will submit the bidding documents to the human resources department in a sealed manner, the unit shall submit the official seal with a copy of the business license and the legal person authorization letter, and the individual bidding shall be stamped with a personal seal and a copy of the contractor's ID card.

2. Tender requirements and instructions

1. About bidders

(1) The bidder may be a unit or an individual, and may consult the contractor before making a quotation for the specific contracting work content, and the specific contracting work content is shown in the annex.

(2) The bidder must have relevant transportation experience and guarantee the ability to not affect the normal production of the contractor, and have certain organizational coordination ability and good personal reputation guarantee.

(3) Ensure legal operation and strictly abide by the rules and regulations of the contracting party.

(4) The bidder shall not subcontract after winning the bid, otherwise it shall be deemed to be in breach of contract.

(5) The bidder contracts the task of pulling raw materials in the factory, putting graphite powder, secondary crushing of green blanks, analysis of joint green blanks, iron red powder, pressing medium crushing hygiene, and machined graphite powder filling in the form of labor services; Ensure that in accordance with the requirements of the production process of the contractor, absolutely obey the production organization arrangement of the contractor, and ensure the completion of the work task in a timely, quality and quantity.

2. About the contracting workflow

(1) Sign the contract and pay the performance bond after winning the bid;

(2) The tenderer shall concentrate on technical training, safety education and necessary work arrangements and deployment of the contractor.

(3) The contractor arranges and organizes labor to carry out on-site operations;

3. About the performance bond

(1) When signing the labor service contract, the successful bidder shall pay a performance bond of 2,<> yuan.

(2) Upon the expiration of the contract, the tendering party shall refund the performance bond paid by the tenderer in accordance with the terms of the contract.

4. About payment methods

Payment is made on a monthly basis according to the contract signed by both parties.

3. Principles and methods of bid evaluation

(1) Evaluate bids and select the best in strict accordance with the requirements and conditions of the bidding documents.

(2) This tender contract will be awarded to the bidder who meets the requirements of the tender documents and has the lowest bidder.

(3) Considering that individual successful bidders have changed when signing the contract, the second and third places with the lowest quotation will be used as alternatives.

IV. Contact Information and Others

(1) Contact information: contact Jin Hongbing Phone: 85559446

(2) If you have not completed the matter, you can call the human resources department.

 

Nantong Yangtze Carbon Co., Ltd

Human Resources Department

November 2017, 11

Related Downloads