Bidding Documents
YANGZI
Release Time:
2018-06-13
Nantong Yangzi Carbon Co., Ltd.'s sporadic projects in the pressing and baking workshop, in line with the principles of fairness, justice, openness and voluntariness, conduct fair bidding to the outside world, and select the best construction units.
Nantong Yangtze Carbon Co., Ltd. sporadic projects in the baking workshop, in accordance with the principles of fairness, justice, openness and voluntariness, conduct fair bidding and select construction units on the basis of merit, and hereby announce the following on relevant matters:
I. Project Overview:
1. Project bidding content
A. Renewal of the original K4 South Asbestos tile enclosure:
Method: According to the owner's requirements, remove the original asbestos tile enclosure wall, and make a new 0.5 thick color steel plate enclosure wall (H=120C steel)
B. Asbestos tile canopy and maintenance wall on both sides of the gas building of the original kneading pot factory:
Method: According to the owner's requirements, remove the original asbestos tile canopy and enclosure wall, and make a new 0.5 thick color steel plate canopy and enclosure wall (H=160C steel)
C. Wall finishing on both sides of the north gate of the original secondary coking plant:
East wall: mixed mortar stucco, exterior wall latex paint twice. Color TBD.
West wall: mixed mortar stucco, exterior wall latex paint twice. Color TBD.
D. The quantity of work shall be measured by each bidding unit according to the on-site situation, and if there are any incomplete matters, contact the contractor before bidding.
E. The project is contracted by the packing material.
F. The demolished construction waste (iron parts transported to the factory scrap iron storage yard) shall be transported by the construction unit outside the factory and disposed of according to regulations.
2. Qualification requirements for bidding units
The construction unit participating in the bidding must have independent legal personality and relevant construction qualifications.
3. Project quotation
This project adopts a one-time quotation, and the settlement will be made at this price after the completion of the project. The price quoted includes all costs such as materials, labor, scaffolding, safety, and taxes.
4. Project Period
Construction period: 20 days
5. Project quality
The quality of this project shall be qualified according to the national construction acceptance specifications and other relevant acceptance standards. The warranty period is three years.
6. Payment for the project
After the completion and acceptance of the project, it will be settled according to the relevant regulations of the company.
7. Bidding matters
The bidders began to collect the tender documents at the Engineering Equipment Division on June 2018, 6, and the bidders submitted the bids at 14 a.m. on June 2018, 6.
The bidding unit shall pay the document and information fee of 100 yuan and (5000,<> yuan of the bid deposit) at the company's accounting and financial office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, and the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Collect and submit the tender documents with the receipt of the Financial Planning Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the relevant departments of the contract of the bidding unit, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
9. Contact Information
Tel:051385559291,051385559292 Contact: Wang Xingshan, Lin Qiang
Bidding unit: Yangzi Carbon