Low headroom driving installation project

YANGZI


Release Time:

2020-11-12

Low-clearance driving installation project in the hoisting area of ​​the raw crushing hoisting system of the intermediate crushing workshop of the pressing workshop.

Low-clearance driving installation project in the hoisting area of ​​the raw crushing hoisting system of the intermediate crushing workshop of the pressing workshop.

See tender documents for details.

Related Downloads

  • File size: 52.0KB