Bidding documents for the production and processing of B1 pot bearing bushes
YANGZI
Release Time:
2017-05-19
Nantong Jiangdong Carbon Co., Ltd. needs to manufacture and process a batch of bearing bushes according to the maintenance needs of the B1 kneading pot in the pressing and baking workshop. Based on the principles of fairness, justice, voluntariness and integrity, it conducts public bidding for them and selects the best manufacturing and processing units. The relevant matters are hereby announced as follows: 1. List of accessories to be processed 1. B1 kneading pot gearbox 1 upper bearing bush 2 pieces 2. B1 kneading pot gear box 1 lower bearing bush 2 pieces 3. B1 kneading pot gearbox 2 upper bearing bush 4 pieces 4. B1 kneading pot gear box 2 lower bearing bushes 4 2. Production technical requirements 1. Quality: in line with the requirements provided by Nantong Jiangdong Carbon Co., Ltd.
Nantong Jiangdong Carbon Co., Ltd. needs to make and process a batch of bearings according to the maintenance needs of the B1 kneading pot in the press baking workshop, and conduct public bidding for them in accordance with the principles of fairness, justice, voluntariness and good faith, and select the production and processing units on the basis of merit. The relevant matters are hereby announced as follows:
First, it is necessary to make a list of processing accessories
1. B1 kneading pot gearbox 1 upper bearing 2pcs
2. B1 kneading pot gearbox 1 lower bearing 2pcs
3. B1 kneading pot gearbox 2 upper bearing 4pcs
4. B1 kneading pot gearbox 2 lower bearing 4pcs
Second, the production technical requirements
1. Quality: meet the drawing requirements provided by Nantong Jiangdong Carbon Co., Ltd.
2. Copper sleeve material: ZQAL9-4;
3. The copper sleeve cannot have cracks, trachoma and other defects.
4. When delivering, a qualified test report must be provided
3. Project Duration
The production period of this batch of accessories: the production is completed within 20 days after the contract is signed, and every day of delay in delivery will be deducted 300 yuan / day per day, which will be deducted from the contract payment.
4. Qualification requirements for bidding units
The bidding unit must have the equipment accessories manufacturing qualification;
5. Quotation method
Quotation basis: drawings provided by Nantong Yangzi Carbon Co., Ltd
This project adopts a one-time quotation, and this price is settled after completion and acceptance; Prices are not adjusted.
6. Payment Methods
Negotiation between the two parties, subject to the contract;
7. Bidding matters
The bidders began to collect the tender documents at the Equipment Office on May 2017, 5, and the bidders submitted the bids before 20 a.m. on May 2017, 5.
The bidding unit shall pay the document and information fee of 100 yuan and (3000,<> yuan of the bid deposit) to the company's accounting and financial office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, and the bidding deposit will be refunded without interest if the winning unit does not win the bid after the opening of the bid, and the winning unit will be converted into a performance bond. (Receipt of tender documents upon receipt of the Accounting Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the bidding unit in conjunction with all relevant departments, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
Contact: Zhang Quansheng Tel: 85559291
Bidding unit: Nantong Jiangdong Carbon Co., Ltd
2017 May 5