Bidding documents for production and processing of 25 press auxiliary plungers

YANGZI


Release Time:

2017-05-19

Nantong Yangzi Carbon Co., Ltd., according to the current situation of the 25th press in the press and baking workshop, needs to manufacture and process the auxiliary cylinder plunger of the 25th press. Based on the principles of fairness, impartiality, voluntariness, and integrity, it conducts public bidding for it and selects the best for production and processing. unit. The relevant matters are hereby announced as follows: 1. List of accessories to be produced and processed 1. 1 left section of the second and fifth pair of plungers 2. 1 piece of right section of the second and fifth pair of plungers 2. Production technical requirements 1. Quality: in line with Nantong Yangzi Carbon Drawings provided by Co., Ltd. as required. 2. The material of the left section of the second and fifth pairs of plungers: QT150-15; the material of the right section of the second and fifth pairs of plungers: 4

According to the current situation of the 25 press in the bakery workshop, Nantong Yangtze Carbon Co., Ltd. needs to make and process the sub-cylinder plunger of the second and fifth presses, and in accordance with the principles of fairness, justice, voluntariness and integrity, open bidding for them, and select the production and processing units on the basis of merit. The relevant matters are hereby announced as follows:

 

First, it is necessary to make a list of processing accessories

1. 1 left section of the <>th plunger

2. 1 right section of the two or five pairs of plungers

Second, the production technical requirements

1. Quality: meet the drawing requirements provided by Nantong Yangzi Carbon Co., Ltd.

2. Material of the left section of the second and fifth sets of plungers: QT150-15; 45 pairs of plunger right section material: <>#;

3. The workpiece cannot have defects such as heavy skin cracks.

4. The surface of the workpiece is chrome-plated, and the chrome plating thickness is 0.03~0.05mm

3. Project Duration

Production period of this batch of accessories: the production is completed within 40 days after the contract is signed, and every day of delay in delivery, 500 yuan / day will be deducted per day, which will be deducted from the contract payment.

4. Qualification requirements for bidding units

The bidding unit must have the equipment accessories manufacturing qualification;

5. Quotation method

Quotation basis: drawings provided by Nantong Yangzi Carbon Co., Ltd

This project adopts a one-time quotation, and this price is settled after completion and acceptance; Prices are not adjusted.

6. Payment Methods

Negotiation between the two parties, subject to the contract;

7. Bidding matters

The bidders began to collect the tender documents at the Equipment Office on May 2017, 5, and the bidders submitted the bids before 20 a.m. on May 2017, 5.

Before receiving (submitting) the bidding, the bidding unit shall pay a document and information fee of 100 yuan and a (bid deposit of 5000,<> yuan) to the company's accounting office, the document and information fee will not be refunded after the opening of the bid, and the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Receipt of tender documents upon receipt of the Accounting Office)

8. Evaluation and determination of bids

The evaluation and determination of bids shall be conducted by the bidding unit in conjunction with all relevant departments, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.

Contact: Zhang Quansheng Tel: 85559291

 

Bidding unit: Nantong Yangtze Carbon Co., Ltd

2017 May 5