Bidding documents for environmental improvement (1)
YANGZI
Release Time:
2017-06-02
Nantong Yangzi Carbon Co., Ltd.'s environmental improvement project (demolition and repair, powder wall and iron door production and installation) project, in line with the principles of fairness, justice, openness, and voluntariness, conducts fair bidding to the outside world and selects the best construction unit. Now The relevant matters are announced as follows: 1. Project overview: 1. Demolition part: A. Demolition of the water tank of the rotary kiln cooling tower. Remove the ground where the watering pool is located. The west side of the pool and the blackboard wall are refreshed. B. The east lounge of the No. 25 hydraulic press is dismantled. Watering floors and repairing walls. C. The three lounges of the machined morning light are dismantled. All the buildings demolished above
Nantong Yangtze Carbon Co., Ltd. environmental remediation (demolition and repair, powder wall and iron gate production and installation part), in accordance with the principles of fairness, justice, openness and voluntariness, fair bidding is carried out to the outside world, and the construction unit is selected on the basis of merit, and the relevant matters are hereby announced as follows:
I. Project Overview:
1. Demolition part:
A. Removal of the cold water tower pool of the rotary kiln. Remove the floor where the watering pond is located. The west side of the pool and the blackboard wall are refreshed.
B. Removal of the east lounge of the 25th hydraulic press. Pour floors and renovate walls.
C. Demolition of three lounges of machined morning light.
All construction waste dismantled above shall be transported by the contractor outside the factory for disposal. (Scrap to the company's scrap yard)
2. Laying drainage pipes in the third and fifth plant buildings. (Including floor grooving, pipe laying, and floor replenishment) (The drainage pipe adopts Ф80 galvanized steel pipe).
3. Two door openings on the south side of the clinker silo of the rotary kiln. (masonry, powder)
4. Repair door hole on the southeast side of the old and medium crush (masonry, powder)
5. Rectification of the west gable wall of the infirmary: the original stucco layer is removed, the cement mortar stucco layer is newly made, and the exterior wall is sprayed.
6. Iron door production, installation and painting. Iron door installation location: west side door of machining B line, southwest door of machining C line, fan room door of D line; The main work is to dismantle the old door and make and install the painted iron door; Iron door requirements: square steel door frame, internal reinforcement support square steel, blue color steel plate as panel, iron door open. The specific workload shall be investigated by the bidders on site.
7. The quantity of work shall be measured by each bidding unit on site according to the requirements of the contracting party, and if there are any incomplete matters, contact the contracting party before bidding.
8. All construction waste under construction shall be transported by the contractor outside the factory for disposal. (Scrap to the company's scrap yard)
9. The project is contracted for materials.
2. Qualification requirements for bidding units
The construction units participating in the bidding must have independent legal personality and civil engineering and above (including level 3) construction qualifications.
3. Project quotation
This project adopts one-time quotation, itemized quotation and summary quotation, and this price is settled after the completion of the project. The quotation must contain the bill of quantities, the project budget, and the final quotation.
4. Project Period
The construction period of this project: completed before June 2017, 6, and 30,1000 yuan per day will be deducted for each day of delay
5. Project quality
The quality of this project shall be qualified against the construction acceptance and other relevant acceptance standards. The warranty period is three years.
6. Payment for the project
After the completion and acceptance of the project, it will be settled according to the relevant regulations of the company.
7. Bidding matters
The bidders began to collect the tender documents at the Engineering Equipment Division on June 2017, 6, and the bidders submitted the bids at 2 a.m. on June 2017, 6.
The bidding unit shall pay the document and information fee of 100 yuan and (bid deposit of 10000,<> yuan) at the company's accounting office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Collect and submit the tender documents with the receipt of the Financial Planning Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the relevant departments of the contract of the bidding unit, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
9. Contact Information
Contact: Lin Qiang Tel: 051385559292, 051385559291
Bidding unit: Nantong Yangtze Carbon Co., Ltd
June 0, <>