Bidding documents for environmental improvement (2)

YANGZI


Release Time:

2017-06-02

Nantong Yangzi Carbon Co., Ltd.'s environmental improvement (plant window rectification and other parts) project, in line with the principles of fairness, justice, openness, and voluntariness, conducts fair bidding to the outside world and selects the best construction unit. The relevant matters are hereby announced as follows: 1. Project General situation: 1. Medium broken building: the steel windows and glass on the north side are prepared and cleaned, and the steel windows are cleaned and closed. 2. Kneading pot workshop: The steel window glass on the north side is prepared and cleaned, and the steel window is cleaned and opened. 3. 3500T hydraulic press factory building: Steel window glass is prepared and scrubbed, and steel window is tidied up and opened and closed. 4. 2500T hydraulic press workshop: windows on the south side

Nantong Yangzi Carbon Co., Ltd. environmental remediation (plant window rectification and other parts) project, in accordance with the principles of fairness, justice, openness and voluntariness, fair bidding is carried out to the outside world, and the construction unit is selected on the basis of merit, and the relevant matters are hereby announced as follows:

 

I. Project Overview:

1. Medium crushed building: the steel window glass on the north side is complete and scrubbed, and the steel window is sorted out to a good switch.

2. Mixing pot workshop: the steel window glass on the north side is equipped and scrubbed, and the steel window is sorted out to a good switch.

3. 3500T hydraulic press workshop: the steel window glass is complete and scrubbed, and the steel window is sorted out to a good switch.

4. 2500T hydraulic press workshop: south side window rectification

A. The bottom lattice window is repaired and whitewashed.

B. The two log windows were removed, the aluminum alloy windows were newly installed, and the window frame line was painted. Aluminum alloy wall thickness 1.2, fixed window.

C. The upper window is renovated, and the glass is complete and scrubbed.

5. Machining B line four sets of window transformation:

A. Lower window Remove the original window, install the aluminum alloy window, and paint the window frame line. Aluminum alloy wall thickness 1.2, sliding window.

B. The upper window is closed by the sun panel.

6. The marketing company and the steel window glass on the north façade of the building are complete.

7. The quantity of work shall be measured by each bidding unit on site according to the requirements of the contracting party, and if there are any incomplete matters, contact the contracting party before bidding.

8. The project is contracted for materials.

2. Qualification requirements for bidding units

The construction units participating in the bidding must have independent legal personality and civil engineering and above (including level 3) construction qualifications.

3. Project quotation

This project adopts one-time quotation, itemized quotation and summary quotation. This price will be settled upon completion of the project. The quotation must contain the bill of quantities, the project budget, and the final quotation.

4. Project Period

The construction period of this project: completed before June 2017, 6, and 30,1000 yuan per day will be deducted for each day of delay

5. Project quality

The quality of this project shall be qualified against the construction acceptance and other relevant acceptance standards. The warranty period is three years.

6. Payment for the project

After the completion and acceptance of the project, it will be settled according to the relevant regulations of the company.

7. Bidding matters

The bidders began to collect the tender documents at the Engineering Equipment Division on June 2017, 6, and the bidders submitted the bids at 5 a.m. on June 2017, 6.

The bidding unit shall pay the document and information fee of 100 yuan and (bid deposit of 10000,<> yuan) at the company's accounting office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Collect and submit the tender documents with the receipt of the Financial Planning Office)

8. Evaluation and determination of bids

The evaluation and determination of bids shall be conducted by the relevant departments of the contract of the bidding unit, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.

9. Contact Information

Contact: Lin Qiang Tel: 051385559292, 051385559291

 

Bidding unit: Nantong Yangtze Carbon Co., Ltd

June 0, <>