Bidding documents for environmental improvement (3)
YANGZI
Release Time:
2017-06-02
Nantong Yangzi Carbon Co., Ltd.'s environmental improvement (road rectification and other parts) project, in line with the principles of fairness, justice, openness, and voluntariness, conducts fair bidding to the outside world and selects the best construction unit. The relevant matters are hereby announced as follows: 1. Project overview : 1. Road reconstruction part: A. Passage behind the electrician's shift (including cable trench repair). B. The west road of Erwu hydraulic press workshop (north to Roasting Road). C. Machining A and B line channels. Road method: eradicate the original road surface and cushion, make a new broken brick cushion 250 thick, pour C35 concrete surface 200 thick, single row two-way
Nantong Yangtze Carbon Co., Ltd. environmental remediation (road rectification and other parts) project, in accordance with the principles of fairness, justice, openness and voluntariness, conduct fair bidding and select construction units on the basis of merit, and hereby announce the following related matters:
I. Project Overview:
1. Road renovation part:
A. Pressure baking electrician after shift channel (including cable trench repair).
B. West road of the 25th hydraulic press plant (north to Roasting Road).
C. Machining A and B line channels.
Road practice: remove the original road surface layer and cushion, make a new broken brick cushion 250 thick, poured C35 concrete surface layer 200 thick, single row two-way 12 rebar, spacing 150.
All construction waste dismantled above shall be transported by the contractor outside the factory for disposal.
2. Prefabricated cable trench cover plate and transported to the place designated by the company.
3. Machining C line workshop west passage air duct cover plate repair. Method: chisel the original cover plate loose concrete to the steel bar, rinse it, add the steel mesh, and pour C35 concrete to the original ground level.
4. Machining D line concrete floor repair, about 500M2. (Original ground running sand)
5. The quantity of work shall be measured by each bidding unit on site according to the requirements of the contracting party, and if there are any incomplete matters, contact the contracting party before bidding.
6. The project is contracted for materials.
2. Qualification requirements for bidding units
The construction units participating in the bidding must have independent legal personality and civil engineering and above (including level 3) construction qualifications.
3. Project quotation
This project adopts a one-time quotation, and this price will be settled after the completion of the project. The quotation must contain the bill of quantities, the project budget, and the final quotation.
4. Project Period
The construction period of this project: cable trench cover plate, completed within one month after the contract is signed, and sent to our company's designated location. The construction period of the remaining projects is 5 days (expected during the National Day period in 2017), and each day delayed in completion will be deducted 1000,<> yuan/day.
5. Project quality
The quality of this project shall be qualified against the construction acceptance and other relevant acceptance standards. The warranty period is three years.
6. Payment for the project
After the completion and acceptance of the project, it will be settled according to the relevant regulations of the company.
7. Bidding matters
The bidders began to collect the tender documents at the Engineering Equipment Division on June 2017, 6, and the bidders submitted the bids at 2 a.m. on June 2017, 6.
The bidding unit shall pay the document and information fee of 100 yuan and (bid deposit of 10000,<> yuan) at the company's accounting office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Collect and submit the tender documents with the receipt of the Financial Planning Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the relevant departments of the contract of the bidding unit, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
9. Contact Information
Contact: Lin Qiang Tel: 051385559292, 051385559291
Bidding unit: Nantong Yangtze Carbon Co., Ltd
June 0, <>