25 Production of bidding documents for press heating jacket and other components
YANGZI
Release Time:
2017-06-15
Nantong Yangzi Carbon Co., Ltd., according to the current situation of 25 presses in the press workshop, needs to produce heating jackets and other components. Based on the principles of fairness, justice, voluntariness and integrity, it conducts public bidding and selects the best production units. The relevant matters are hereby announced as follows: 1. List of parts to be produced 1. 1 piece of heating jacket 2. 1 piece of bushing according to the drawing 2. Technical requirements for production 2. Production quality: It meets all the requirements of the drawings provided by Nantong Yangzi Carbon Co., Ltd. 3. The material of the heating jacket is 30CrMnMo;
According to the current situation of the 25 press in the bakery workshop, Nantong Yangzi Carbon Co., Ltd. needs to make heating sleeves and other components, and in accordance with the principles of fairness, justice, voluntariness and integrity, it will conduct public bidding and select the production unit on the basis of merit. The relevant matters are hereby announced as follows:
First, the parts list needs to be made
1. 1 heating sleeve
2. Bushings 1 piece each according to the picture
Second, the production technical requirements
1. The parts of this tender are the stressed parts of the 2500-ton hydraulic press.
2. Production quality: meet all the requirements of the drawings provided by Nantong Yangtze Carbon Co., Ltd.
3. The material of the heating sleeve is 30CrMnMo; The bushing material is ZG50Mn2.
4. This component is the key component of the 2500-ton hydraulic press, and each bidding unit must ensure that the material and manufacturing, heat treatment and processing technology meet the requirements of drawings and process specifications.
5. All the processing and production process of the above accessories, the bidding party can enter the next process after confirming on site, and the bidding party will supervise the key processes of the production process on site.
3. Project Duration
Production period of this batch of accessories: the production is completed within 90 days after the contract is signed, and every day of delay in delivery will be deducted 500 yuan / day per day, which will be deducted from the contract amount.
4. Qualification requirements for bidding units
The bidding unit must have the equipment accessories manufacturing qualification;
5. Quotation method
Quotation basis: drawings provided by Nantong Yangzi Carbon Co., Ltd
This project adopts a one-time quotation and settles at this price; Prices are not adjusted.
6. Payment Methods
Consultation between the parties;
7. Bidding matters
The bidders began to collect the tender documents at the Equipment Office on June 2017, 6, and the bidders submitted the bids before 15 a.m. on June 2017, 6.
The bidding unit shall pay the document and information fee of 300 yuan (10000,50000 yuan for the bidding deposit) at the company's accounting and finance office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, and the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. The winning bidder shall pay a quality deposit of <>,<> yuan before signing the contract, and the quality deposit will be refunded without interest one year after the parts are put into operation. (Collect and submit the tender documents with the receipt of the Financial Planning Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the bidding unit in conjunction with all relevant departments, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
Contact: Zhang Quansheng Tel: 85559291
Bidding unit: Nantong Yangtze Carbon Co., Ltd
June 2017, 6
Related Downloads