Environmental Improvement Project IV Bidding Documents
YANGZI
Release Time:
2017-08-01
Nantong Yangzi Carbon Co., Ltd. environmental improvement (wall part) project, in line with the principles of fairness, justice, openness, and voluntariness, conducts fair bidding to the outside world and selects the best construction unit. The relevant matters are hereby announced as follows: 1. Project overview: 1. One-story house opposite the communication room: A. Remove the original paint layer on the outer wall, re-mix the mortar and paint, and paint the outer wall twice. B. The paint on the iron door is new. C. Paint the exterior wall of the north wall of the communication room twice. D. The window glass is repaired. E. The roof of the original maintenance team's color steel plate was used to fill leaks. 2. The original yellow paint walls on both sides of 1# road are new: refilling is required
Nantong Yangtze Carbon Co., Ltd. environmental remediation (wall part) project, in accordance with the principles of fairness, justice, openness and voluntariness, fair bidding is carried out to the outside world, and the construction unit is selected on the basis of merit, and the relevant matters are hereby announced as follows:
I. Project Overview:
1. Bungalow opposite the communication room:
A. The exterior wall is shoveled from the original stucco layer, remixed with mortar painting, and the exterior wall paint is repeated twice.
B. The iron door paint is new.
C. The exterior wall of the north wall of the communication room is painted twice.
D. Window glass filling.
E. The original protection factory team color steel plate roof leakage.
2, 1# The original yellow paint wall on both sides of the road is new: it is required to powder up, shovel the original paint layer that has been peeled, and brush the exterior wall paint twice. (smoke gray) gantry bracket paint next to the pilot room, requirements: rust removal, red dan primer twice, gray topcoat twice.
3. 2500T green warehouse
A. Complete the lattice window and brush with white water.
B. The lower half of the wall is mixed with mortar on the lower half of the masonry wall on the west side of the doorway, and the upper half is laid with lattice windows and painted with white water.
4. The steel window on the north side of the 3500T green warehouse is filled with glass.
5. The south interior wall of the machining C line is new, and the requirements: shovel the original interior wall paint layer, putty twice, interior wall paint twice.
6. The quantity of work shall be measured by each bidding unit on site according to the requirements of the contracting party, and if there are any unfinished matters, contact the contracting party before bidding.
7. The project is contracted for materials.
2. Qualification requirements for bidding units
The construction units participating in the bidding must have independent legal personality and civil engineering and above (including level 3) construction qualifications.
3. Project quotation
This project adopts a one-time quotation (each individual item is quoted separately), and this price is settled after the completion of the project. The quotation must contain the bill of quantities, the project budget, and the final quotation.
4. Project Period
Construction period: 20 days
5. Project quality
The quality of this project shall be qualified against the construction acceptance and other relevant acceptance standards. The warranty period is three years.
6. Payment for the project
After the completion and acceptance of the project, it will be settled according to the relevant regulations of the company.
7. Bidding matters
The bidders began to collect the tender documents at the Engineering Equipment Division on August 2017, 8, and the bidders submitted the bids at 2 a.m. on August 2017, 8.
The bidding unit shall pay the document and information fee of 100 yuan and (5000,<> yuan of the bid deposit) at the company's accounting and financial office before receiving (submitting) the tender document, the document and information fee will not be refunded after the opening of the bid, and the bidding deposit will be refunded without interest if the winning unit does not win the bid after the bid is opened, and the winning unit will be converted into a performance bond. (Collect and submit the tender documents with the receipt of the Financial Planning Office)
8. Evaluation and determination of bids
The evaluation and determination of bids shall be conducted by the relevant departments of the contract of the bidding unit, and the bidding unit shall not be obliged to explain to the unsuccessful unit the reasons for not winning the bid.
9. Contact Information
Contact: Lin Qiang Tel: 051385559292, 051385559291
Bidding unit: Yangzi Carbon
August 0, <>